What Information is required in a Commissioning (Initial) Local Exhaust Ventilation (LEV) assessment
To comply with Regulation 9 of the COSHH Regulations 2002, as amended 2004, a thorough examination and test of LEV must be carried out at...
Can the Commissioning (Initial) Assessment of my Local Exhaust Ventilation (LEV) be done at the same
It is preferable to have the Commissioning (Initial) Assessment completed once the extraction system has settled into normal operation...